On-site Productivity Issues
In recent years, productivity in the UK’s construction sector has plummeted. Although the latest ONS data shows a minor increase in productivity at the end of 2017, the Government is still desperate for the construction sector to increase its output - claiming that increasing productivity and build numbers could add up to £15 billion to the UK economy each year.
A number of manufacturers that operate in the construction supply chain, such as Polypipe Terrain, have been harnessing the benefits of factory manufacturing and offsite construction as a solution to decreasing productivity.
One of the easiest ways to speed up on-site builds is to keep things simple. Using fabricated drainage stacks which arrive on site complete and ready to install is one way to speed up proceedings. This helps contractors to get things moving more quickly, with an accurate, efficient installation process.
Additionally, the choice of materials can have a huge impact on productivity. When compared to alternative materials, plastic drainage pipes can negate the need for skilled labourers and allow the project to be completed much more quickly. Not only will this allow contractors to focus elsewhere, but it will also help budgets work harder.
Find out more about fabricated drainage stacks from Polypipe Terrain.
[edit] Related articles on Designing Buildings Wiki
- Advanced construction technology.
- BRE Üserhuus
- British post-war mass housing.
- Design for deconstruction.
- Design for Manufacture and Assembly (DfMA).
- Fabricated drainage stacks.
- Flying factory.
- In situ.
- Kit house.
- Modern methods of construction.
- Modular buildings.
- Offsite manufacturing.
- Off site materials.
- Off-site construction.
- Off-site prefabrication of buildings: A guide to connection choices.
- On site.
- Prefabrication.
- Prefabricated structural panels.
- Ronan Point.
- Secondary Ventilation Stacks in Tall Buildings.
- Y:Cube development in Mitcham.
Featured articles and news
Art of Building CIOB photographic competition public vote
The last week to vote for a winner until 10 January 2025.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.
20 years of the Chartered Environmentalist
If not now, when?
Journeys in Industrious England
Thomas Baskerville’s expeditions in the 1600s.
Top 25 Building Safety Wiki articles of 2024
Take a look what most people have been reading about.
Life and death at Highgate Cemetery
Balancing burials and tourism.
The 25 most read articles on DB for 2024
Design portion to procurement route and all between.
The act of preservation may sometimes be futile.
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.